Boker Magnum Long Lead EDC Black G10 8Cr13MoV Folding Pocket Knife - (222)
Crafted for everyday carry, the Boker Magnum Long Lead EDC pocket knife combines functionality with a sleek design. The durable G10 handle ensures a secure grip while the 8Cr13MoV stainless steel blade offers resilience and precision edge retention. Its manual opening mechanism and slipjoint lock provide reliability and safety during use. The knife features a right-handed orientation with a single plain edge drop point blade, ideal for a variety of cutting tasks. With a blade length falling between 2.76 and 4 inches, it's compact enough for easy portability while still being ample for most situations. The black color adds a touch of sophistication to this practical tool. Measures 4" closed.
For Sale By: Shandon Steel
![]()
Item # 112773
$35.00
Shipping Details:
Shipping & Handling to United States Addresses: $5.00
Shipping Discounts Available for Multiple Items Purchased from Shandon Steel:
If this item is purchased with another item from Shandon Steel that has a shipping cost of $5.00 or more, standard shipping to US addresses for this item will be discounted to $2.00.
Check Out More Great Products Related To This One!!!
Boker USA "Bridging the Continent" Great American Story Delrin Stockman Knife NIB
1 In Stock
$60.00
For Sale By:
Sanders Knives
Boker USA Vintage Tree Brand 4 Blade Congress Model 6113 Pocket Knife (138)
1 In Stock
$75.00
For Sale By:
swtthg
Boker USA Vintage Tree Brand 4 Blade Congress Model 6113 Pocket Knife (133)
1 In Stock
$80.00
For Sale By:
swtthg
Boker USA Vintage 4 Blade Congress Model 6006 Pocket Knife (109)
1 In Stock
$85.00
For Sale By:
swtthg
Boker Solingen Germany Tree Brand Classic #920 Jigged Black Cigar Knife
1 In Stock
$125.00
For Sale By:
Sanders Knives
BOKER MAGNUM KAL74DES Automat Kalashnikov 74 Desert Tan LinerLock IN BOX
1 In Stock
$75.00
For Sale By:
Soldster
BOKER 01KALS74 Automat Kalashnikov 74 Black Manual Button Lock w/ OMP Box
1 In Stock
$65.00
For Sale By:
Soldster
BOKER MAGNUM Taiwan Large Silver Drop Point Folding Automatic
1 In Stock
$65.00
For Sale By:
Soldster
BOKER PLUS Taiwan AUS-8 Drop Point Automat Kalashnikov 74 (#17249)
1 In Stock
$65.00
For Sale By:
Soldster
BOKER PLUS Taiwan AUS-8 Drop Point Automat Kalashnikov 74 (#16335)
1 In Stock
$65.00
For Sale By:
Soldster
H.Boker Tree Brand Solingen Germany 4 Blade Mother Of Pearl Congess Long Pull Knife Worked Bols.MINT
1 In Stock
$179.00
For Sale By:
Briley Cutlery
BOKER PLUS 01KALS74B Gray Drop Point Combo Automat Kalashnikov 74 w/ OMP Box
1 In Stock
$75.00
For Sale By:
Soldster
BOKER PLUS Jim Wagner Reality Black Coated Recurve Serrated Tanto Automatic
1 In Stock
$145.00
For Sale By:
Soldster
Boker Copperhead D2 Carbon Steel Lockback Knife Stag Handles
1 In Stock
$95.00
For Sale By:
Bloodline Blades LLC.
Boker Tree Brand Congress Genuine Stag Bone 1095 Carbon Steel Blades
1 In Stock
$72.50
For Sale By:
Bloodline Blades LLC.
Boker Solingen Germany Rostfrei Tree Brand Classic #30 Jigged Black 1 Blade Pocket Knife in Box
1 In Stock
$100.00
For Sale By:
Sanders Knives
Boker Tree Brand Solingen Germany Bone 8573 Stockman Knife NIB
1 In Stock
$125.00
For Sale By:
Sanders Knives
Boker Tree Brand Titan Lockback 3.13" Closed Folding Pocket Knife Made in Germany
1 In Stock
$100.00 $125.00
For Sale By:
Kases Kutlery Plus









