About to swap a badly worn/sharpened blade in this old 125 with a new one.
Question ..... are these Pin Through Bolster construction or Swindon Key ?
For the life of me I cannot see any sign of a pin in the bolster ....I'd rather do this with a minimum of fuss so asking first
Thanks in advance
Derek
Info on Schrade Old Timer 125 Construction Please
- Brumbydownunder
- Posts: 451
- Joined: Sun Dec 27, 2015 7:14 am
- Location: Central NSW Australia
Info on Schrade Old Timer 125 Construction Please
"Belong Where The Moment Finds You"
- orvet
- Gold Tier

- Posts: 19901
- Joined: Tue May 16, 2006 6:23 am
- Location: Willamette Valley, Oregon
Re: Info on Schrade Old Timer 125 Construction Please
They are Swinden.
I'll be back in a few minutes and post a picture of what the insides look like.
I'll be back in a few minutes and post a picture of what the insides look like.
Dale
AAPK Administrator
Please visit my AAPK store: www.allaboutpocketknives.com/orvet
Job 13:15
"Buy more ammo!" - Johnnie Fain
“Evil is Powerless If The Good are Unafraid.” – Ronald Reagan
AAPK Administrator
Please visit my AAPK store: www.allaboutpocketknives.com/orvet
Job 13:15
"Buy more ammo!" - Johnnie Fain
“Evil is Powerless If The Good are Unafraid.” – Ronald Reagan
- orvet
- Gold Tier

- Posts: 19901
- Joined: Tue May 16, 2006 6:23 am
- Location: Willamette Valley, Oregon
Re: Info on Schrade Old Timer 125 Construction Please
This is what the liner, blade & Swinden pin assembly looks like when it is ready to be installed between the handles.
Note that the spring is separate and it only takes one small pin to hold the rear bolsters together and the spring in place.
The Swinden Rivet of course goes in the key ways in the front bolsters.
I hope this helps. Your timing was good because I had just been checking to see if I had everything I needed to rebuild the old 125OT,
I had just put the blade away, but the 125OT was still laying on my workbench.
Note that the spring is separate and it only takes one small pin to hold the rear bolsters together and the spring in place.
The Swinden Rivet of course goes in the key ways in the front bolsters.
I hope this helps. Your timing was good because I had just been checking to see if I had everything I needed to rebuild the old 125OT,
I had just put the blade away, but the 125OT was still laying on my workbench.
Dale
AAPK Administrator
Please visit my AAPK store: www.allaboutpocketknives.com/orvet
Job 13:15
"Buy more ammo!" - Johnnie Fain
“Evil is Powerless If The Good are Unafraid.” – Ronald Reagan
AAPK Administrator
Please visit my AAPK store: www.allaboutpocketknives.com/orvet
Job 13:15
"Buy more ammo!" - Johnnie Fain
“Evil is Powerless If The Good are Unafraid.” – Ronald Reagan
- Brumbydownunder
- Posts: 451
- Joined: Sun Dec 27, 2015 7:14 am
- Location: Central NSW Australia
Re: Info on Schrade Old Timer 125 Construction Please
Dale thank you Sir for your timely response ..... very VERY Helpfulorvet wrote: ↑Wed Dec 11, 2019 6:26 am This is what the liner, blade & Swinden pin assembly looks like when it is ready to be installed between the handles.
Note that the spring is separate and it only takes one small pin to hold the rear bolsters together and the spring in place.
The Swinden Rivet of course I'd send the key ways in the front bolsters.
I hope this helps. Your timing was good because I had just been checking to see if I had everything I needed to rebuild the old 125OT,
I had just put the blade away, but the 125OT was still laying on my workbench.
125OT blade-liner-Swinden pin.jpg
"Belong Where The Moment Finds You"