Boker Magnum Long Lead EDC Black G10 8Cr13MoV Folding Pocket Knife - (222)






Crafted for everyday carry, the Boker Magnum Long Lead EDC pocket knife combines functionality with a sleek design. The durable G10 handle ensures a secure grip while the 8Cr13MoV stainless steel blade offers resilience and precision edge retention. Its manual opening mechanism and slipjoint lock provide reliability and safety during use. The knife features a right-handed orientation with a single plain edge drop point blade, ideal for a variety of cutting tasks. With a blade length falling between 2.76 and 4 inches, it's compact enough for easy portability while still being ample for most situations. The black color adds a touch of sophistication to this practical tool. Measures 4" closed.
For Sale By: Shandon Steel
Shipping Details:
Shipping Discounts Available for Multiple Items Purchased from Shandon Steel:
If this item is purchased with another item from Shandon Steel that has a shipping cost of $5.00 or more, standard shipping to US addresses for this item will be discounted to $2.00.